Singapore-built aircraft complete first phase of flight tests in Germany

Singapore-built aircraft complete first phase of flight tests in Germany


SINGAPORE, Aug 26 — Two electric vertical take-off and landing (eVTOL) aircraft developed and built in Singapore have reportedly completed their first phase of flight tests in Cochstedt, Germany.

The Straits Times reported that the 8m- and 3m-wingspan prototypes were produced by more than 20 Nanyang Technological University (NTU) students and alumni together with professor James Wang, and are research demonstrators not currently designed to carry passengers.

During two and a half weeks of testing in July, the smaller aircraft reportedly recorded nearly two hours of flight time across 17 flights, while the larger model flew for a combined 43 minutes over 20 flights.




Read Full Article At Source

Share. Save. Don't Miss The Buzz: XFacebookRedditLINETelegramWhatsAppGmail

Leave a Reply