SINGAPORE – Construction work has been suspended at the site of the Chong Pang City integrated development after a metal bar from the worksite fell through the roof of a nearby HDB block.
The Singapore Land Authority (SLA) said on May 3 that the metal bar fell during dismantling works at an upper floor of the nine-storey development on May 2.
The bar fell onto a nearby four-storey-high Housing Board block, Block 103 Yishun Ring Road, and damaged part of the roof along the common corridor, it said.
No one was injured and there was no damage to the interior of the HDB flats. The authority added that rectification works will be carried out as soon as possible.
SLA said a professional engineer has assessed the damage and confirmed that the overall roof structure is intact and safe.
