SINGAPORE: Tanjong Pagar Road will undergo construction works from November 2026 to December 2027 to add new cycling paths and a high covered linkway.
According to a notice put up by the Land Transport Authority (LTA) in the area, a new cycling path and footpath will be added between Craig Road and Duxton Hill.
The roadside parking lots between Cook Street and Craig Road, located on the same stretch, will be removed.
These existing roadside parking spaces between Craig Road and Maxwell Road will make way for wider footpaths and cycling paths, LTA said on Friday (Nov 27) in response to CNA queries.
A new cycling path between Duxton Hill and Maxwell Road, and a new cycling path and footpath near Tanjong Pagar Plaza Market and Food Centre will also be constructed. The existing drainage systems at these sections will also be upgraded, the notice said.
Read Full Article At Source


