Drainage canal in flood-prone Bukit Timah fully upgraded

Drainage canal in flood-prone Bukit Timah fully upgraded


SINGAPORE – The flood-prone Bukit Timah area will likely experience some relief during the year-end rainy season, now that canal upgrading works there are completed.

National water agency PUB on Oct 23 announced that the last 900m stretch of a 2.3km canal there has been enlarged.

The upgraded canal can hold 30% more flood waters than before, which could help limit flash floods like those that had recurred in the area over the past 15 years.

Work to upgrade this stretch started in 2019 and was initially expected to be completed by the first quarter of 2024. The delays were due to the Covid-19 pandemic and restricted working hours to minimise peak traffic congestion, among other issues.

But because of Bukit Timah’s low-lying, valley-like terrain, as well as increasingly erratic rainfall patterns caused by climate change, drainage infrastructure alone may not be able to prevent flash floods completely, PUB cautioned.

There are also limitations to installing more drains in land-scarce Singapore, the agency noted, pointing to how the whole Bukit Timah area is already served by three drainage systems spanning nearly 10km in all.

To address this, PUB said it will, at the end of 2026, call for a study to identify longer-term solutions to strengthen flood resilience across Bukit Timah.

The study will assess a range of anti-flood solutions, including underground structures to hold flood waters. It will also explore solutions that can integrate with existing infrastructure and future developments, added PUB.

Acknowledging that the Bukit Timah area is one of Singapore’s “most challenging catchments”, PUB’s deputy chief executive of flood resilience Angela Koh said very intense storms can still overwhelm drainage infrastructure.

“We will continue to improve drainage and raise roads where feasible, while taking a holistic review of the catchment to identify more integrated solutions for the longer term,” she added.

The 2.3km Upper Bukit Timah Canal is the main anti-flood measure for a 1,000ha area. The canal runs from Beauty World MRT station to Maple Avenue.




Read Full Article At Source

Share. Save. Don't Miss The Buzz: XFacebookRedditLINETelegramWhatsAppGmail

Leave a Reply

Your email address will not be published. Required fields are marked *