Originally slated to finish on Apr 19, the tunnel strengthening works are now expected to be completed by Apr 10.
Train services will also resume fully in both tunnels of the affected stretch on Apr 10.
With the resumption of normal Circle Line service at these stations, peak period shuttle buses will operate at reduced frequency before ceasing operation after Apr 13.





