{"id":96244,"date":"2026-10-29T05:52:17","date_gmt":"2026-10-28T21:52:17","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=96244"},"modified":"2026-10-29T05:52:17","modified_gmt":"2026-10-28T21:52:17","slug":"seletar-sunday-cycling-lane-to-double-in-2027","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=96244","title":{"rendered":"Seletar Sunday cycling lane to double in 2027"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"text-primary article-summary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013 <!-- -->A <a href=\"https:\/\/www.straitstimes.com\/singapore\/cycling-lane-along-west-camp-road-in-seletar-for-sunday-mornings-now-permanent?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">cycling lane in Seletar<\/span><\/a> will more than double in length by the first quarter of 2027, with construction work slated to begin in November.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The Sunday Cycling Lane \u2013 which is now 4.6km long \u2013 will extend to include Seletar Aerospace Drive and Punggol Barat Drive, said the Land Transport Auhority (LTA) in a statement on Oct 28.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Once completed, it will stretch for 11.2km and offer cyclists a \u201clonger and more continuous route\u201d, LTA added.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Trials for a dedicated on-road cycling lane began on Oct 16, 2022. The lane is open on Sunday mornings between 5am and 11am. During those hours, only buses and cyclists are allowed in the lane, and there is no limit on the group size for cyclists.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">LTA said the aim was to assess the feasibility of providing dedicated road space for large groups of cyclists during times when traffic is low.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The Sunday Cycling Lane initiative was made permanent in April 2023. LTA said it has been well utilised since its implementation, with traffic conditions and bus operations <!-- -->also <!-- -->remaining smooth.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:920 \/ 1216\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/5d2313751febd1a9f1c64b232d03b4ad14a75647d9f1b342ebc9b3415b03f220?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/5d2313751febd1a9f1c64b232d03b4ad14a75647d9f1b342ebc9b3415b03f220?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/5d2313751febd1a9f1c64b232d03b4ad14a75647d9f1b342ebc9b3415b03f220?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/5d2313751febd1a9f1c64b232d03b4ad14a75647d9f1b342ebc9b3415b03f220\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/5d2313751febd1a9f1c64b232d03b4ad14a75647d9f1b342ebc9b3415b03f220\" alt=\"Map of extended Sunday cycling lane in Seletar.\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\" fetchpriority=\"auto\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The extended cycling route will make use of the existing lane\u2019s design and operating guidelines, with solid blue lane markings used to mark out where cyclists should ride.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">However, dotted blue lane markings as well as red \u201ctransverse markings\u201d will be used near junctions and entrances to buildings. Transverse markings help regulate, guide or warn drivers at intersections and crossings.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">LTA said motorists can still make turns at the spots where the cycling lane is operational on Sundays, but they need to be cautious because cyclists and buses might be using the lane.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It said: \u201cCyclists are reminded to stay within the cycling lane and obey traffic signals.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">\u201cDuring non-operational hours of the Sunday Cycling Lane, cyclists are strongly reminded to comply with prevailing cycling regulations, including the group size requirements and traffic rules.\u201d<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The only other dedicated on-road cycling lane in Singapore is the 10km-long lane in Tanah Merah Coast Road.<\/p>\n<\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/sunday-cycling-lane-in-seletar-to-double-in-length-when-works-are-completed-by-first-quarter-of-2027\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013 A cycling lane in Seletar will more than double in length by the first quarter of 2027, with construction work slated to begin&#8230;<\/p>\n","protected":false},"author":1,"featured_media":96245,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-96244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/96244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96244"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/96244\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/96245"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}