{"id":9323,"date":"2025-11-06T11:48:34","date_gmt":"2025-11-06T03:48:34","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=9323"},"modified":"2025-11-06T11:48:34","modified_gmt":"2025-11-06T03:48:34","slug":"singapore-second-most-expensive-data-centre-construction-market-report","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=9323","title":{"rendered":"Singapore second-most expensive data centre construction market: report"},"content":{"rendered":"<p><br \/>\n<\/p>\n<p>A Turner &amp; Townsend report shows that Singapore is once again the second-most expensive market in which to build data centres<\/p>\n<div data-testid=\"article-body-container\">\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">[SINGAPORE] The Republic held on to its place as the second-most expensive market for data centres in 2025, said a Turner &amp; Townsend report.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">The professional services company found that construction costs grew 5 per cent year on year, from US$13.8 to US$14.53 per watt, in its 2025 Data Centre Construction Cost Report.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">This was only behind Tokyo, Japan and ahead of the Silicon Valley region in the US. Regionally, Kuala Lumpur and Jakarta clocked in at US$11.37 and US$11.21 per watt, respectively, while Shanghai was even lower at US$6.12.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">The report comes as suitable land for data centres becomes harder to find, with Keppel already coming up <a class=\"text-verticals-btblue underline\" data-testid=\"article-annotation-link-component\" href=\"https:\/\/www.businesstimes.com.sg\/esg\/increasingly-challenging-find-suitable-land-data-centres-keppel-ceo\" target=\"_blank\" rel=\"noopener\">against such barriers<\/a>. A Knight Frank <a class=\"text-verticals-btblue underline\" data-testid=\"article-annotation-link-component\" href=\"https:\/\/www.businesstimes.com.sg\/international\/asean\/johor-fastest-growing-south-east-asian-data-centre-hub-singapore-expansion-remains-constrained\" target=\"_blank\" rel=\"noopener\">report in September<\/a> said Singapore\u2019s \u201cstrict planning controls\u201d have resulted in global tech firms looking north instead and <u><a class=\"text-verticals-btblue underline\" data-testid=\"article-annotation-link-component\" href=\"https:\/\/www.businesstimes.com.sg\/opinion-features\/south-east-asias-reality-check-whats-hindering-data-centres-green-transition\" target=\"_blank\" rel=\"noopener\">Johor has emerged as the \u201ctop alternative\u201d<\/a><\/u>.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Singapore last month also announced plans to build a low-carbon data centre park <a class=\"text-verticals-btblue underline\" data-testid=\"article-annotation-link-component\" href=\"https:\/\/www.businesstimes.com.sg\/esg\/singapore-build-700mw-data-centre-park-jurong-island-pilot-biomethane-imports-tan-see-leng\" target=\"_blank\" rel=\"noopener\">on Jurong Island<\/a> with up to 700 megawatts of capacity in what will be the country\u2019s largest such facility.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Turner &amp; Townsend said that power requirements are \u201cincreasing significantly\u201d, with power needs rising from around 3 kilowatts per rack to over 100 kilowatts per rack in advanced facilities. <\/p>\n<div data-component=\"component-container\" class=\"container px-0 no-print\">\n<div class=\"no-print md:-mx- py-10\">\n<div class=\"no-print mb-6 border border-gray-175 p-6 md:p-8 lg:-mx-8\" data-testid=\"article-newsletter-component\">\n<div data-component=\"generic-newsletter\">\n<h5 class=\"mb-6 border-b border-gray-175 pb-2 !font-poppins text-4xs font-medium uppercase leading-normal tracking-widest text-gray-515\">BT in your inbox<\/h5>\n<div class=\"flex py-3 md:px-10 md:py-6\"><img loading=\"lazy\" decoding=\"async\" alt=\"Newsletter Img\" class=\"hidden h-auto max-w-full self-start min-[321px]:block\" width=\"75\" height=\"75\" src=\"https:\/\/www.businesstimes.com.sg\/assets-web2\/generic_newsletter-CGny2zps.png\"\/><\/p>\n<div class=\"min-[321px]:pl-4 md:pl-6\">\n<p role=\"description\" class=\"mb-3 font-public-sans text-base font-light tracking-normal text-gray-850 md:text-lg\">Start and end each day with the latest news stories and analyses delivered straight to your inbox.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">\u201cThis shift is pushing capital expenditures up by 20 to 40 per cent, largely due to the integration of advanced cooling systems and upgraded electrical infrastructure,\u201d said the company.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Project schedules in the Asia-Pacific region also face significant delays, with design changes cited as the top challenge by a third of respondents, found the report.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">In Singapore, while the supply chain is \u201cimproving\u201d, specialised equipment and skilled labour for advanced cooling remain in short supply, extending lead times. <\/p>\n<div data-component=\"component-container\" class=\"container px-0 no-print\">\n<div class=\"no-print mb-6 mt-8 border border-gray-175 p-6 md:-mx-8 md:mt-0 md:p-8\" data-testid=\"article-read-more-component\">\n<div>\n<p class=\"mb-6 border-b border-gray-250 pb-4 font-poppins text-4xs font-medium tracking-widest text-gray-515\">SEE ALSO<\/p>\n<div data-testid=\"section-related-stories\" class=\"overflow-hidden transition-all duration-300\" style=\"height:0\">\n<div class=\"mb-6\" data-testid=\"article-read-more-individual-card-component\">\n<div data-testid=\"basic-card-component\" data-cueid=\"7721572\" class=\"relative flex flex-wrap items-start gap-4\">\n<div class=\"relative w-[70px] lg:w-[90px] aspect-3x2 order-1 flex-shrink-0\">\n<div class=\"w-full overflow-hidden relative flex\" data-testid=\"article-thumbnail-component\"><a class=\"block h-full w-full\" href=\"https:\/\/www.businesstimes.com.sg\/esg\/singapore-build-700mw-data-centre-park-jurong-island-pilot-biomethane-imports-tan-see-leng?ref=article-see-also\" data-discover=\"true\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"relative z-10 h-full w-full object-cover\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/businesstimes\/7e35b12b83d43e388b06dffac71833fa797e1d9fa59ffed0f930847d0434db59?w=960&amp;dpr=1&amp;f=webp\" alt=\"The Republic also aims to develop Jurong Island into a hub for speciality chemicals and sustainable materials. \" width=\"1499\" height=\"1135\"\/><\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mb-6\" data-testid=\"article-read-more-individual-card-component\">\n<div data-testid=\"basic-card-component\" data-cueid=\"7728541\" class=\"relative flex flex-wrap items-start gap-4\">\n<div class=\"relative w-[70px] lg:w-[90px] aspect-3x2 order-1 flex-shrink-0\">\n<div class=\"w-full overflow-hidden relative flex\" data-testid=\"article-thumbnail-component\"><a class=\"block h-full w-full\" href=\"https:\/\/www.businesstimes.com.sg\/esg\/green-data-centres-singapore-companies-call-new-inter-agency-body-innovative-financing?ref=article-see-also\" data-discover=\"true\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"relative z-10 h-full w-full object-cover\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/businesstimes\/5c478182a9c825756ad74cfd5b82e737d9319f52a3f572f1029c1a485e1790e5?w=960&amp;dpr=1&amp;f=webp\" alt=\"AirTrunk SGP1 in Singapore. The Republic has positioned itself as a data centre hub in the region, with over 1.4 gigawatts in capacity.\" width=\"1920\" height=\"1080\"\/><\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Additionally, the report found that delays in sourcing critical equipment, particularly for high-density and liquid cooling systems, add complexity to modular campus developments.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Turner &amp; Townsend described Singapore\u2019s cost dynamics as \u201cuniquely intense\u201d due to its market maturity and regulatory landscape. <\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Stricter environmental regulations, including a new mandate for up to a 30 per cent reduction in energy consumption and a focus on achieving a reduced Power Usage Effectiveness of 1.3 or lower, are contributing to higher costs, the report found.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Turner &amp; Townsend added that complex design requirements further drive engineering and construction expenses higher, making development in Singapore more costly compared to other markets in the region.\u00a0 <\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">While nearly half of respondents across the 52 markets polled said that power availability is the \u201cmost prominent obstacle\u201d to on-schedule projects, power availability in Singapore is \u201cdetermined by clear environment, social and governance (ESG) alignment\u201d.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">\u201cOnly projects with strong ESG alignment and low-carbon outcomes are considered for power allocation, and developers must present robust sustainability plans to qualify,\u201d said Turner &amp; Townsend.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Still, the report found that Singapore\u2019s long-term policy stability and \u201cclear ESG mandates\u201d provide investors with \u201cstrong\u201d assurances, helping them mitigate the regulatory uncertainty in other markets.<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.businesstimes.com.sg\/startups-tech\/technology\/singapore-second-most-expensive-data-centre-construction-market-report\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Turner &amp; Townsend report shows that Singapore is once again the second-most expensive market in which to build data centres [SINGAPORE] The Republic held&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1864,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-9323","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/9323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9323"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/9323\/revisions"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}