{"id":85740,"date":"2026-09-17T21:46:59","date_gmt":"2026-09-17T13:46:59","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=85740"},"modified":"2026-09-17T21:46:59","modified_gmt":"2026-09-17T13:46:59","slug":"construction-robots-on-trial-in-jurong-could-be-deployed-as-early-as-2028","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=85740","title":{"rendered":"Construction robots on trial in Jurong could be deployed as early as 2028"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"text-primary article-summary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013 <!-- -->What if the next machine at Singapore\u2019s new construction sites had nobody sitting behind its controls?\u00a0<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">A pilot, launched by JTC Corporation and Kajima, is putting autonomous excavators and compactors to the test at Bulim<!-- --> <!-- -->autonomous yard in Jurong Innovation District, with the machines performing tasks under real site conditions.<!-- --> <!-- -->They can carry out assigned tasks independently, while operators monitor and oversee them remotely from a nearby control room.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The project will explore how autonomous heavy construction equipment can help address manpower constraints and improve workplace safety.\u00a0<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Calvin Chung, assistant chief executive of engineering and operations at JTC, said: \u201cIf the pilot succeeds, we will deploy autonomous heavy construction equipment across suitable projects in our pipeline and support wider industry adoption.\u201d<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The first phase of the project started in January and includes four machines: two excavators and two compactors. It is set to end in early 2027.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The second pilot will then begin, introducing autonomous bulldozers and dump trucks to create a coordinated fleet. Once the trials are complete, the machines may be pushed out to JTC\u2019s sites, specifically within the Jurong Innovation District, by 2028.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">This is the first project at JTC\u2019s new <!-- -->1ha<!-- --> sandbox, <a href=\"https:\/\/www.straitstimes.com\/singapore\/housing\/more-support-for-construction-tech-firms-to-innovate-developers-adopting-robotics-and-automation?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">announced by National Development Minister Chee Hong Tat at ConTech@PDD<\/span><\/a> in July. It is being conducted in partnership with the Public Sector Science &amp; Technology Policy &amp; Plans Office, and Housing Board.<\/p>\n<h2 class=\"font-primary-headline-md-semibold\" data-testid=\"article-subhead-test-id\">Improving productivity with fewer workers<\/h2>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Productivity is crucial as JTC is looking at a pipeline of at least 800ha of earthworks projects over the next five years.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">According to the Building and Construction Authority, Singapore\u2019s total construction demand is projected to reach $53 billion in 2026, while industry reports show the sector faces a persistent manpower shortfall of nearly 15 per cent across various roles.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/4e40b032237c9b4bbdd0cf99bebdf9e38f8fc4f18f74dfc5143f1804dc2d34e2?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/4e40b032237c9b4bbdd0cf99bebdf9e38f8fc4f18f74dfc5143f1804dc2d34e2?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/4e40b032237c9b4bbdd0cf99bebdf9e38f8fc4f18f74dfc5143f1804dc2d34e2?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/4e40b032237c9b4bbdd0cf99bebdf9e38f8fc4f18f74dfc5143f1804dc2d34e2\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/4e40b032237c9b4bbdd0cf99bebdf9e38f8fc4f18f74dfc5143f1804dc2d34e2\" alt=\"Besides excavators, compactors are also being tested at JTC\u2019s sandbox for validating autonomous construction equipment under real site conditions.\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">Besides excavators, compactors are also being tested at JTC\u2019s sandbox for validating autonomous construction equipment under real site conditions.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JASON QUAH<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">\u201cAdding more manpower is not a sustainable way to meet Singapore\u2019s future construction needs,\u201d Chung said.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">JTC is targeting a reduction in operator manpower by half, with one operator overseeing two machines from a control room away from the construction zone.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Under the trial, an operator assigns tasks and sets virtual boundaries for each machine from an operating room situated 20m from the sandbox.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Using sensors and artificial intelligence, the machines then perform the tasks without an operator seated inside or near the cabin. The activities are monitored remotely by staff who have a line of sight to the machines and will intervene whenever an issue occurs.\u00a0<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">For this trial, two operators from local contractor Kok Tong Construction (KTC) travelled to Japan to be trained by Kajima\u2019s operators on how to use the robots. Lessons from this pilot are also being documented for the rest of the industry.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Project engineer Tosh Chin Kah Woo, who oversees activities from the control room, underwent training in Japan for one week, where he learnt how to operate and supervise the robots. In the past, he had to physically cordon off the work area for the excavator, but now, the commands and boundaries are built into the system, he said.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/abdc5879b55e10033cd5505a1cf75c178a0dd2a65064c08060fc39f53118717a?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/abdc5879b55e10033cd5505a1cf75c178a0dd2a65064c08060fc39f53118717a?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/abdc5879b55e10033cd5505a1cf75c178a0dd2a65064c08060fc39f53118717a?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/abdc5879b55e10033cd5505a1cf75c178a0dd2a65064c08060fc39f53118717a\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/abdc5879b55e10033cd5505a1cf75c178a0dd2a65064c08060fc39f53118717a\" alt=\"KTC project engineer Tosh Chin Kah Woo managing autonomous construction equipment from a control room during a trial on Sept 16.\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">KTC project engineer Tosh Chin Kah Woo managing autonomous construction equipment from a control room during a trial on Sept 16.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JASON QUAH<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">If these machines are deployed, foreign workers, who make up nearly 90 per cent of the manual semi-skilled workforce in Singapore\u2019s construction industry, may get the chance to upskill and become more productive.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Many migrant workers have already been trained to use robotics at construction sites, including robots that are used for painting, JTC said in response to The Straits Times\u2019 queries. It added that workers\u2019 suitability for this training will depend on their skill level and aptitude.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">For this trial, JTC is aiming for a 20 per cent to 30 per cent increase in construction speed compared with traditional machines, said Cheong Jiawen, director of <!-- -->future<!-- --> of building and infrastructure at JTC. He added that the trial looks very promising so far, and JTC is looking to further improve productivity.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Additionally, construction robots reduce workers\u2019 exposure to some on-site safety hazards by reducing the need for personnel to operate machinery or work closely with moving equipment.\u00a0<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">JTC is also working with the Manpower Ministry to develop operating guidelines and safeguards for the deployment of these machines. These include virtual fences to contain the machines, sensors to detect people and obstacles, and emergency-stop controls on site and in the control room.<\/p>\n<h2 class=\"font-primary-headline-md-semibold\" data-testid=\"article-subhead-test-id\">Retrofitting traditional machines<\/h2>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">To create construction robots, traditional machines are retrofitted with technology from multiple partners. Retrofitting existing machines with new technology allows for easier and more cost-effective adoption as contractors can upgrade machines they already own, rather than replace entire fleets.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">To automate digging, the excavator uses technology from Gravis Robotics, a Zurich-based start-up developing autonomous software and hardware for earth-moving equipment. The compactor, which presses down construction material, runs on Kajima\u2019s automated construction system, A4CSEL. This is the first deployment of the system outside Japan.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Kajima is working with KTC and equipment provider Tractors Singapore on the retrofitting process.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Luke Wu, managing director of The GEAR by Kajima, said the system is suited to large-area operations, based on its use in Japan. For example, during the construction of Naruse Dam in Akita prefecture, three operators based 400km away managed a total of 14 robots which ran continuously for up to 70 hours at one point.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Kajima senior executive officer Yoshihiko Riho said: \u201cWe believe the combination of Kajima\u2019s technologies and Singapore\u2019s innovation-driven environment will help realise the next generation of construction.\u201d<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Beyond the pilot, JTC will collaborate with public agencies, contractors, equipment providers, research institutions and technology companies to conduct more autonomous <!-- -->construction <!-- -->trials at <!-- -->its <!-- -->Bulim<!-- --> sandbox<!-- -->.<\/p>\n<\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/construction-robots-on-trial-could-be-deployed-as-early-as-2028\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013 What if the next machine at Singapore\u2019s new construction sites had nobody sitting behind its controls?\u00a0 A pilot, launched by JTC Corporation and&#8230;<\/p>\n","protected":false},"author":1,"featured_media":85741,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-85740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"brizy_media":[],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/85740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=85740"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/85740\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/85741"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=85740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=85740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=85740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}