{"id":80735,"date":"2026-08-30T13:18:04","date_gmt":"2026-08-30T05:18:04","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=80735"},"modified":"2026-08-30T13:18:04","modified_gmt":"2026-08-30T05:18:04","slug":"canberra-residences-owners-sue-contractor-over-defects","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=80735","title":{"rendered":"Canberra Residences owners sue contractor over defects"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"text-primary article-summary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013 Residents of Canberra Residences in Sembawang are heading to court over claims that defects at the condominium remain unresolved more than a decade after the development was completed.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The management corporation (MCST) is suing main contractor MCC Engineering (Singapore), formerly known as China Jingye Construction Engineering (Singapore), over an alleged breach of a 2020 settlement agreement.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The dispute dates back to June 2019, when the MCST commenced its legal proceedings for the first time against condo developer MCC Land (Singapore) and 17 other parties over alleged defects at the project.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The lawsuit ended after the MCST, main contractor and developer signed a settlement agreement on Sept 1, 2020. The agreement was intended to settle all claims, demands and <a href=\"https:\/\/www.straitstimes.com\/singapore\/housing\/developers-behind-defective-projects-may-be-barred-from-buying-land-selling-homes-for-up-to-5-years?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">liabilities arising from the development<\/span><\/a> and the earlier lawsuit.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It required the contractor to carry out rectification, upgrading and drainage works at the development.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">But in its latest lawsuit, the MCST \u2013 represented by Drew and Napier managing director for dispute resolution Mahesh Rai \u2013 alleged that it is still grappling with water ponding at lift lobbies and basement areas, as well as water seepage throughout the development.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Its statement of claim, filed in 2025, noted other alleged issues such as defective and incomplete paintwork, exposed and rusting steel fixtures and shattered balcony glass panels.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1140 \/ 2025\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/042b83b0de5ce671d85493f51ad420ac4ffa89bdedc5c863fe6777686ba99eaa?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/042b83b0de5ce671d85493f51ad420ac4ffa89bdedc5c863fe6777686ba99eaa?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/042b83b0de5ce671d85493f51ad420ac4ffa89bdedc5c863fe6777686ba99eaa?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/042b83b0de5ce671d85493f51ad420ac4ffa89bdedc5c863fe6777686ba99eaa\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/042b83b0de5ce671d85493f51ad420ac4ffa89bdedc5c863fe6777686ba99eaa\" alt=\"In its statement of claim filed in 2025, Canberra Residences MCST highlighted alleged issues such as defective and incomplete including plastering. The defendant disputed the claims and said that repainting was completed by January 2023.\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">In its statement of claim filed in 2025, Canberra Residences MCST highlighted alleged issues such as defective and incomplete including plastering. The defendant disputed the claims and said that repainting was completed by January 2023.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JOYCE LIM<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Canberra Residences received its temporary occupation permit in June 2013. The condominium has 13 blocks and 320 units. It also has a basement carpark, a swimming pool, two gymnasiums, a clubhouse, children\u2019s playground and barbeque pits.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Management council chairman Leslie Lye told The Straits Times that residents began encountering defects soon after they moved into the development in 2013.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">\u201cSome homeowners had floor tiles pop up. One resident had an entire kitchen cabinet above the stove collapse. It was reported by the media. Others saw their cabinets sagging,\u201d Lye recalled.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Many residents approached the developer directly and some defects were repaired.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">\u201cBut soon after, more problems were discovered. More than half of the residents experienced water seepage into their units after heavy rain. There was also water ponding at lift lobbies and basement carpark,\u201d said Lye.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1140 \/ 2025\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c8d8a2cb74d8f34b0bf41c2c3e31dcdfac9855ffa60c9b409a84fc0d126f09ea?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c8d8a2cb74d8f34b0bf41c2c3e31dcdfac9855ffa60c9b409a84fc0d126f09ea?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c8d8a2cb74d8f34b0bf41c2c3e31dcdfac9855ffa60c9b409a84fc0d126f09ea?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c8d8a2cb74d8f34b0bf41c2c3e31dcdfac9855ffa60c9b409a84fc0d126f09ea\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c8d8a2cb74d8f34b0bf41c2c3e31dcdfac9855ffa60c9b409a84fc0d126f09ea\" alt=\"A notice put up at one of the lift lobbies at the basement carpark to caution residents of the slipper floor due to the water seepage issue.\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">A notice put up at one of the lift lobbies at the basement carpark to caution residents of the slipper floor due to the water seepage issue.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JOYCE LIM<\/p>\n<\/figcaption><\/figure>\n<h2 class=\"font-primary-headline-md-semibold\" data-testid=\"article-subhead-test-id\">Glass panels shattered<\/h2>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Another concern was the<!-- --> <!-- -->over 4,000<!-- --> <!-- -->glass panels installed at balconies and elsewhere around the development, Lye added.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">He said that over time, about 400 had spontaneously shattered. The developer agreed to replace the balcony glass panels, but the replacement exercise was halted twice because of disagreements over the quality of the panels.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">A penthouse owner who wanted to be known as only Gan S.T. said his balcony glass has been replaced twice since he moved in in 2013. Earlier in 20<!-- -->26<!-- -->, a third panel shattered, said Gan.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/6c1178d60b46559b2c7d5919b3bb7d2bb2f6afa54eee6b7f37963d90a6eee158?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/6c1178d60b46559b2c7d5919b3bb7d2bb2f6afa54eee6b7f37963d90a6eee158?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/6c1178d60b46559b2c7d5919b3bb7d2bb2f6afa54eee6b7f37963d90a6eee158?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/6c1178d60b46559b2c7d5919b3bb7d2bb2f6afa54eee6b7f37963d90a6eee158\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/6c1178d60b46559b2c7d5919b3bb7d2bb2f6afa54eee6b7f37963d90a6eee158\" alt=\"A shattered balcony glass at a penthouse unit in Canberra Residences. Owner Gan S.T. said his balcony glass has been replaced twice, but a panel has shattered again for the third time.\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">A shattered balcony glass at a penthouse unit in Canberra Residences. Owner Gan S.T. said his balcony glass has been replaced twice, but a panel has shattered again for the third time.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JOYCE LIM<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Under the settlement agreement, MCC Land and MCC Engineering had agreed to carry a range of rectification works. These included replacement of balcony glass, as well as tackling ponding at lift lobbies, water seepage, defective paintwork, floor finishes and issues at the swimming pool and water features.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The MCST claimed in its latest lawsuit that the contractor had breached the agreement as the replacement of the glass was not in accordance with the agreed method, which resulted in the shattering of some replaced glass panels.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The agreement also set out timelines for rectification works to be completed within 12 months after the parties come to an agreement on the method to be used for these works.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The MCST\u2019s position is that the detailed methods were agreed on on March 5, 2021, hence the rectification works should have been completed a year later, by March 5, 2022.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It alleged that the works were not completed, or not carried out according to the agreed methods and standards.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1140 \/ 2025\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/e169bdd4aae96d560f5514ea73eb726c83d31faafd62cdd89ba47443dff02f05?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/e169bdd4aae96d560f5514ea73eb726c83d31faafd62cdd89ba47443dff02f05?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/e169bdd4aae96d560f5514ea73eb726c83d31faafd62cdd89ba47443dff02f05?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/e169bdd4aae96d560f5514ea73eb726c83d31faafd62cdd89ba47443dff02f05\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/e169bdd4aae96d560f5514ea73eb726c83d31faafd62cdd89ba47443dff02f05\" alt=\"Canberra Residences MCST claimed that missing and or detached tiles to feature ponds have not been replaced.\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">Canberra Residences MCST claimed that missing and or detached tiles to feature ponds have not been replaced.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JOYCE LIM<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It also alleged that even when rectification works were completed, the defendant failed to rectify defects that arose within the 12-month liability period.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Court documents filed stated that other problems remain.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">These include water ponding at the ground floor and basement areas and seepage in both gyms that resulted in stains, lime bloom and corrosion. There is also water ingress at staircases and private units.<\/p>\n<h2 class=\"font-primary-headline-md-semibold\" data-testid=\"article-subhead-test-id\">Defendant disputes claims<\/h2>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Main contractor MCC Engineering \u2013 represented by Kevin Kwek, director of law firm Legal Solutions \u2013 has denied breaching the 2020 settlement agreement.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">In its defendant\u2019s reply, the contractor claimed to have completed most of the rectification works. In cases where it could not carry out the works,<!-- --> <!-- -->it said this was because the MCST failed to provide access, approvals or confirmations needed for works to proceed.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">MCC Engineering also disputed that March 5, 2022, was an absolute completion deadline for the rectification works, as the timeline for completion was subject to several conditions, including full and uninterrupted access to be provided by the MCST and regulatory clearances.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It also cited delays which it attributed to the Covid-19 outbreak.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">According to its defence, balcony glass replacements for the condo units were completed in October 2023, except for two units. In one unit, the glass could not be replaced because of an obstruction by a partition wall. Another unit had invisible grilles hindering access.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It also claimed to have completed repainting and lift lobby works by January 2023. Water seepage works were completed by the end of December 2021, while floor finish works were completed by January 2022.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/cf120d0ec88ceb7d7a5651ccd231693bf372a4f09c940c98406d17fd0f6a7acb?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/cf120d0ec88ceb7d7a5651ccd231693bf372a4f09c940c98406d17fd0f6a7acb?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/cf120d0ec88ceb7d7a5651ccd231693bf372a4f09c940c98406d17fd0f6a7acb?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/cf120d0ec88ceb7d7a5651ccd231693bf372a4f09c940c98406d17fd0f6a7acb\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/cf120d0ec88ceb7d7a5651ccd231693bf372a4f09c940c98406d17fd0f6a7acb\" alt=\"Canberra Residences received its temporary occupation permit in June 2013. The condominium has 13 blocks and 320 units.\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">Canberra Residences received its temporary occupation permit in June 2013. The condominium has 13 blocks and 320 units.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: JOYCE LIM<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The contractor said some of the<!-- --> <!-- -->current<!-- --> <!-- -->defects are new and fall outside of the settlement agreement. They argued that the alleged defects arose from fair wear and tear or environmental staining. They could also be a result of poor maintenance by the MCST or damage by third parties, it said.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Beyond rectification works, the MCST had also alleged that most upgrading works agreed<!-- --> <!-- -->upon<!-- --> <!-- -->in the settlement remain outstanding, including an electronic security system, corridor louvres, perimeter and drainage works and shelters at common amenities.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">MCC Engineering disputed those claims as well, saying some works were dependent on approvals, agreed specifications or formal directions from the MCST. On drainage, it says several components were completed while other works stalled because it did not receive the necessary approval or access to proceed.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The case is set for an 11-day trial starting Oct 20.<\/p>\n<\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/housing\/shattered-glass-water-seepage-canberra-residences-owners-sue-contractor-over-unresolved-defects\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013 Residents of Canberra Residences in Sembawang are heading to court over claims that defects at the condominium remain unresolved more than a decade&#8230;<\/p>\n","protected":false},"author":1,"featured_media":80736,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-80735","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"brizy_media":[],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/80735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=80735"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/80735\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/80736"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=80735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=80735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=80735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}