{"id":73130,"date":"2026-07-31T14:49:03","date_gmt":"2026-07-31T06:49:03","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=73130"},"modified":"2026-07-31T14:49:03","modified_gmt":"2026-07-31T06:49:03","slug":"cross-island-line-4-new-mrt-stations-with-interchanges-at-jurong-pier-gul-circle","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=73130","title":{"rendered":"Cross Island Line: 4 new MRT stations with interchanges at Jurong Pier, Gul Circle"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013 <!-- -->The third and final phase of the <a href=\"https:\/\/www.straitstimes.com\/multimedia\/graphics\/2023\/11\/cross-island-mrt-line\/index.html?shell=&amp;ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">Cross Island Line (CRL)<\/span><\/a> will have four underground stations and help get commuters to the western region faster after it is completed in the late 2030s.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The latest stretch \u2013 about 10km when fully completed \u2013 will connect to other lines at two interchanges at Jurong Pier and Gul Circle and, for now, are numbered CR20 to CR23.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The CR20 station will serve residents in Taman Jurong, while CR21 will serve as a gateway to Jurong Island. It will also link to the upcoming Jurong Region Line (JRL).<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">CR22 will be located within Jurong Industrial Estate. The final station, CR23 or Gul Circle station, will link to the East-West Line (EWL).<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Transport Minister Jeffrey Siow, speaking at the Singapore Rail Test Centre on July 31, said the stations will serve residents and workers across the western industrial estates and substantially improve connectivity to the rest of the island.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">He added that the CRL will play a critical role in the rail network, with 11 interchange stations. This will strengthen the resilience of the MRT network as more commuters will be able to take alternative routes during a service disruption, he said.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/3cc4d2310588d9f61371413e5484b43bca9187c3d80e5a73328b8045d2532241?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/3cc4d2310588d9f61371413e5484b43bca9187c3d80e5a73328b8045d2532241?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/3cc4d2310588d9f61371413e5484b43bca9187c3d80e5a73328b8045d2532241?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/3cc4d2310588d9f61371413e5484b43bca9187c3d80e5a73328b8045d2532241\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/3cc4d2310588d9f61371413e5484b43bca9187c3d80e5a73328b8045d2532241\" alt=\"Transport Minister Jeffrey Siow said the stations will serve residents and workers across the western industrial estates and substantially improve connectivity to the rest of the island.\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 pt-08 pb-16\">\n<p class=\"inline text-secondary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-caption-test-id\">Transport Minister Jeffrey Siow said the stations will serve residents and workers across the western industrial estates and substantially improve connectivity to the rest of the island.<\/p>\n<p class=\"inline text-tertiary font-secondary-captions-baseline-regular\" data-testid=\"inline-media-credit-test-id\"> <!-- -->ST PHOTO: GIN TAY<\/p>\n<\/figcaption><\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">In a joint statement on July 31, the Land Transport Authority (LTA) and Singapore Land Authority (SLA) said the last stage of the CRL will provide residents and workers in the western region with \u201cmore direct and convenient\u201d travel options by MRT.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">Work on the third phase is slated to begin in 2027. Noise and vibration impact studies will be carried out before work starts, the statement said.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">When the CRL is fully operational, passengers travelling to and from the western parts of Singapore can save up to 50 minutes in travelling time, Siow said.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">For instance, the commute from Sin Ming Gardens to Jurong Pier Road will take about 40 minutes in future, compared with 90 minutes via bus and train now.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The journey from Taman Jurong Skyline \u2013 an upcoming BTO project \u2013 to Ang Mo Kio Industrial Park 2 will take 45 minutes with the CRL, down from 90 minutes by bus now.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">To facilitate construction work, the authorities said seven industrial properties will be acquired, and eight other industrial properties with be partially acquired.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The partial acquisitions will involve minor parts of the property, such as boundary fences. Affected businesses can continue operations, and the acquired parts will be restored to their original conditions after the works are done.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">LTA said that as part of phase three, a second CRL train depot of around 23ha will be built at the former Raffles Country Club site to provide maintenance facilities and stabling for trains. This will be co-located with a multi-storey bus depot that will provide parking, charging and maintenance facilities for public buses.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">In his speech, Siow said LTA is <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/lta-studying-feasibility-of-bus-rapid-transit-system-for-tuas-south?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">studying the feasibility of a Bus Rapid Transit system in Tuas South<\/span><\/a> to shuttle workers between their workplaces and MRT stations.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The CRL is Singapore\u2019s eighth MRT line and, when completed, will be the country\u2019s longest fully underground rail line, spanning more than 65km across 27 stations from Changi Airport Terminal 5 (T5) in the east to Gul Circle in the west.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It is being built in three phases and will connect major residential and employment hubs, including Jurong Lake District and Punggol Digital District.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1080 \/ 1350\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/26b33a4f273b92c2f16eb2b1ca0ce293fbb9e1d1cb00f302a488e842ff4adb27?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/26b33a4f273b92c2f16eb2b1ca0ce293fbb9e1d1cb00f302a488e842ff4adb27?w=720\"\/><source media=\"(min-width: 721px and max-width: 3999px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/26b33a4f273b92c2f16eb2b1ca0ce293fbb9e1d1cb00f302a488e842ff4adb27?w=900\"\/><source media=\"(min-width: 4000px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/26b33a4f273b92c2f16eb2b1ca0ce293fbb9e1d1cb00f302a488e842ff4adb27\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/26b33a4f273b92c2f16eb2b1ca0ce293fbb9e1d1cb00f302a488e842ff4adb27\" alt=\"The CRL is Singapore\u2019s eighth MRT line and, when completed, will be the country\u2019s longest fully underground rail line.\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">First announced in the 2013 Land Transport Master Plan, the target completion date for the entire line was about 2030. Construction delays were caused by the Covid-19 pandemic, and an environmental impact assessment in the planning stages because the line would run under the Central Catchment Nature Reserve.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The first phase of the CRL comprises 12 stations over 29km, from Aviation Park in Changi to Bright Hill, and is slated to be completed in 2030. A 7.3km four-station extension linking Pasir Ris and Punggol is expected to follow in 2032.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">A 5.8km extension from Aviation Park will connect directly to T5 in future.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The 15km second phase, from Turf City to Jurong Lake District, is also <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/construction-starts-on-cross-island-line-phase-2-6-mrt-stations-in-spores-west-ready-by-2032?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"inline font-tertiary-body-baseline-regular\" data-testid=\"typography-test-id\">expected to be completed in 2032<\/span><\/a> and includes stations, at King Albert Park, Maju, Clementi and West Coast.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">It will connect with the Downtown Line at King Albert Park and the EWL at Clementi. King Albert Park station on the CRL, at about 50m below ground, will be Singapore\u2019s deepest underground MRT station.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">When fully operational, the CRL is expected to serve at least 600,000 passenger trips daily, with ridership projected to grow to around one million in the longer term.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">The first CRL train arrived in Singapore earlier in 2026, according to a Facebook post by LTA on May 31.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">In its Facebook post, LTA said commuters can expect 44 fully automated six-car trains on the CRL, along with wider gangways (platforms connecting train cars) for smoother passenger movement and a more comfortable journey.<\/p>\n<p class=\"text-primary font-tertiary-body-baseline-regular\" data-testid=\"article-paragraph-annotation-test-id\">There will also be smart monitoring and diagnostic systems that help detect potential faults early and improve reliability, said LTA of the new line.<\/p>\n<\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/4-new-mrt-stations-to-be-built-for-cross-island-line-interchanges-at-jurong-pier-gul-circle\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013 The third and final phase of the Cross Island Line (CRL) will have four underground stations and help get commuters to the western&#8230;<\/p>\n","protected":false},"author":1,"featured_media":73131,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-73130","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/73130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=73130"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/73130\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/73131"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=73130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=73130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=73130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}