{"id":68271,"date":"2026-07-13T07:27:01","date_gmt":"2026-07-12T23:27:01","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=68271"},"modified":"2026-07-13T07:27:01","modified_gmt":"2026-07-12T23:27:01","slug":"malaysias-data-centre-pipeline-beats-its-neighbours-but-singapore-will-retain-premium-status-jpmorgan","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=68271","title":{"rendered":"Malaysia&#8217;s data centre pipeline beats its neighbours, but Singapore will retain premium status: JPMorgan"},"content":{"rendered":"<p><br \/>\n<\/p>\n<p data-testid=\"article-description\">Republic\u2019s tighter green rules hand scale and new projects to Malaysia, but it will keep premium status<\/p>\n<div xmlns:default=\"http:\/\/www.w3.org\/2000\/svg\" data-testid=\"article-body-container\">\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">[SINGAPORE]<strong> <\/strong>Singapore\u2019s data centre market will retain its pricing power and premium status due to its high standards on data centre efficiency, according to JPMorgan.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">But those very same tighter efficiency regulations will also push the next wave of hyperscale and artificial intelligence capacity into Malaysia, according to its report.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">In a research note on Jul 7, JPMorgan analysts said Singapore\u2019s proposed efficiency standards will act as a \u201cstructural catalyst\u201d that sharpens the distinct roles of both markets.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">While Singapore moves to optimise its scarce land and power resources, Malaysia is rapidly becoming the preferred destination for incremental regional capacity.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">\u201cIn short, Singapore optimises every megawatt (MW); Malaysia captures the next megawatt,\u201d said the report.<\/p>\n<h2 class=\"-tracking-5 mb-4 md:mb-6\" data-testid=\"heading-component\">A premium squeeze<\/h2>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Singapore currently ranks among the most expensive data centre markets globally, commanding monthly rents of US$330 to US$475 per kilowatt, noted the report.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Driven by near-full occupancy and tight capacity, those rates are more than double the cost in developed markets such as Sydney and Northern Virginia.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">That supply squeeze is expected to intensify under Singapore\u2019s draft Digital Infrastructure Bill.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Under Section 33 of the proposed bill, any data centre operator with a critical IT load of 3 MW or more will be legally mandated to meet strict baseline facility-level energy and water efficiency requirements.<\/p>\n<div data-component=\"component-container\" class=\"container px-0 no-print\">\n<div class=\"no-print mb-6 mt-8 border border-gray-175 p-6 md:-mx-8 md:mt-0 md:p-8\" data-testid=\"article-read-more-component\">\n<div>\n<p class=\"mb-6 border-b border-gray-250 pb-4 font-poppins text-4xs font-medium tracking-10 text-gray-515\">SEE ALSO<\/p>\n<div data-testid=\"section-related-stories\" class=\"overflow-hidden transition-all duration-300\" style=\"height:0\">\n<div class=\"mb-6\" data-testid=\"article-read-more-individual-card-component\">\n<div data-testid=\"basic-card-component\" data-cueid=\"9321757\" class=\"relative flex flex-wrap items-start gap-4\">\n<div class=\"relative w-[70px] lg:w-[90px] aspect-3x2 order-1 flex-shrink-0\">\n<div class=\"w-full overflow-hidden relative flex\" data-testid=\"article-thumbnail-component\"><a class=\"block h-full w-full\" href=\"https:\/\/www.businesstimes.com.sg\/wealth\/wealth-investing\/us-tech-stocks-stumble-ai-boom-far-over?ref=article-see-also\" data-discover=\"true\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"relative z-10 h-full w-full object-cover\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/businesstimes\/59ff457c82d0ad00f1e8c239a22c006d4a9b9b40dff137603392dff937a617ae?w=240&amp;dpr=1&amp;f=webp\" alt=\"Investor sentiment over tech stocks has turned more cautious. Between Jun 18 and Jul 2, the tech-heavy Nasdaq-100 index fell more than 3.5%.\" width=\"6000\" height=\"4000\"\/><\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">The legislation also grants regulators the power to forcefully reduce an operator\u2019s allowed electrical capacity for compliance failures, and allows for heavy financial penalties of up to 10 per cent of an operator\u2019s annual Singapore turnover.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">JPMorgan expects these prescribed rules to force both new and existing operators towards tight 1.25 to 1.3 Power Usage Effectiveness (PUE) thresholds over time, as defined in Singapore\u2019s 2024 Green Data Centre Roadmap.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">PUE is a ratio that describes how efficiently a data centre uses energy, where a range of one to 1.2 is the top standard and the 1.3 to 1.5 range is considered to be highly efficient.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">While new supply from the CFA-2 allocation of about 200 MW is entering the market, it comes attached to these higher efficiency thresholds. CFA-2 is Singapore\u2019s second call for applications for data centres that allocates limited capacity to best-in-class operators.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">JPMorgan said this regulatory move will be a net positive for local landlord pricing power, as it reinforces asset scarcity.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Furthermore, with construction costs sitting at a steep US$12 million per megawatt, the bank noted that redeveloping older facilities such as Keppel DC Reit\u2019s Singapore 1 facility can yield highly attractive returns on investment (ROI) of 7 to 8 per cent.<\/p>\n<h2 class=\"-tracking-5 mb-4 md:mb-6\" data-testid=\"heading-component\">Malaysia\u2019s mega pipeline<\/h2>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">As Singapore constrains its footprint, Malaysia\u2019s data centre pipeline has exploded to nearly 13 gigawatts (GW) \u2013 a capacity pool larger than Indonesia, Thailand and Singapore combined.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">JPMorgan added that Malaysia\u2019s investment case has evolved beyond just being an overflow market for Singapore. Hyperscalers are prioritising the country due to execution speed and lower costs, with development outlays averaging US$7 million per megawatt, compared with Singapore\u2019s US$12 million.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">For one, a single-utility framework, led by Tenaga Nasional via its Green Lane Pathway, allows for energisation timelines of around three years, beating Thailand\u2019s four-year average.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Malaysia\u2019s Corporate Renewable Energy Supply Scheme also provides direct green energy access, while the Digital Ecosystem Acceleration scheme offers tax allowances covering 60 to 100 per cent of qualifying capital expenditure.<\/p>\n<h2 class=\"-tracking-5 mb-4 md:mb-6\" data-testid=\"heading-component\">ESG backlash<\/h2>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">The pivot towards Malaysia does not come without risks. JPMorgan highlighted that rapid infrastructure deployment is facing growing public and environmental scrutiny, pointing to recent local protests in Johor over resource usage alongside similar pushbacks in the US and Singapore.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">Consequently, maintaining a \u201csocial licence\u201d via green energy adoption, local skills development and community ecosystem building will become critical to keeping project timelines on track.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">For equity investors navigating the regional AI infrastructure boom, JPMorgan highlighted two preferred vehicles.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6\" data-testid=\"article-paragraph-component\">In Singapore, <!-- --> <!-- -->Keppel DC Reit<!-- --> <!-- --> remains the brokerage\u2019s top pick to capture Singapore\u2019s resilient rental growth and high ROI brownfield upgrades.<\/p>\n<p class=\"whitespace-pre-wrap break-words mb-4 md:mb-6 inline-block\" data-testid=\"article-paragraph-component\">Meanwhile, Sunway Construction is the preferred pure-play proxy to capture the construction tailwinds of the ongoing 13 GW pipeline boom across the Causeway.<\/p>\n<\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.businesstimes.com.sg\/international\/asean\/malaysias-data-centre-pipeline-beats-its-neighbours-singapore-will-retain-premium-status-jpmorgan\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Republic\u2019s tighter green rules hand scale and new projects to Malaysia, but it will keep premium status [SINGAPORE] Singapore\u2019s data centre market will retain its&#8230;<\/p>\n","protected":false},"author":1,"featured_media":68272,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-68271","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/68271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=68271"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/68271\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/68272"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=68271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=68271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=68271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}