{"id":61186,"date":"2026-06-16T17:16:02","date_gmt":"2026-06-16T09:16:02","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=61186"},"modified":"2026-06-16T17:16:02","modified_gmt":"2026-06-16T09:16:02","slug":"onn-hafiz-urges-putrajaya-to-expedite-work-on-e-art-system-for-jb","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=61186","title":{"rendered":"Onn Hafiz urges Putrajaya to expedite work on E-ART system for JB"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div id=\"story-body\" role=\"article\">\n                <!-- Content data --><\/p>\n<p>KULAI: Caretaker Johor Mentri Besar Datuk Onn Hafiz Ghazi has urged Putrajaya to speed up implementation of the Elevated Autonomous Rapid Transit (E-ART) project.<\/p>\n<p>He said it is the key long-term solution to easing traffic congestion in Johor Baru once the Rapid Transit System (RTS) Link begins operations.<\/p>\n<p>He said the short- and medium-term measures being undertaken, including expanding park and ride facilities, implementing smart traffic management systems and reorganising the movement of buses, taxis and e-hailing vehicles at JB Sentral, were only temporary solutions.<\/p>\n<p>&#8220;These measures are necessary because the main project capable of dispersing traffic from the RTS has yet to begin.<\/p>\n<p>&#8220;Therefore, there is one project that we must continue to focus on and expedite, namely the E-ART project,\u201d he said during the launch of the Southern Shuttle train service operations at Kulai Railway Station here on Tuesday (June 16).<\/p>\n<p>Also present was Transport Minister Anthony Loke.<\/p>\n<p><strong>ALSO READ<\/strong>: <a href=\"https:\/\/www.thestar.com.my\/news\/nation\/2026\/05\/17\/cabinet-approves-rm10bil-e-art-project-to-ease-johor-baru-traffic\" target=\"_blank\" rel=\"noopener\">Cabinet approves RM10bil E-ART project to ease Johor Baru traffic<\/a>\u00a0<\/p>\n<p>Onn Hafiz added that the E-ART project had already been presented at a Cabinet meeting in 2024, but physical works have yet to begin.<\/p>\n<p>He said Johoreans were waiting for a clear timeline, particularly as to when construction would begin.<\/p>\n<p>&#8220;The question now is when this project will start. The people of Johor want to know when we can conduct a site visit together for this project.<\/p>\n<p>&#8220;As far as I understand, the letter of award has yet to be issued, and even after works begin, the project is expected to take between four and five years to complete,&#8221; he said.<\/p>\n<p>He stressed that the need to accelerate the project was becoming increasingly urgent as the RTS Link connecting Bukit Chagar and Woodlands North is scheduled to begin operations in early 2027.<\/p>\n<p>Without an efficient and high-capacity urban public transport system, he warned, the increase in passenger volume could put greater strain on Johor Baru\u2019s road network.<\/p>\n<p>Drawing a comparison with Penang\u2019s Mutiara Line Light Rail Transit (LRT) project, which has a budget ceiling of RM16.8bil with physical works already ongoing, Onn Hafiz said Johor hoped to receive similar attention and priority from the Federal Government.<\/p>\n<p>He noted that Johor Baru alone has a population of about 1.8 million, almost equivalent to the entire population of Penang, while also serving as one of the country\u2019s busiest international gateways.<\/p>\n<p>He said E-ART was more than just a development initiative, describing it as a crucial federal intervention that would directly improve daily mobility, reduce congestion and strengthen connectivity between the RTS Link and key areas in Johor Baru.<\/p>\n<p>&#8220;If this project can be expedited, the credit will go to the Federal Government. It will be all yours,&#8221; he added.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><br \/>\n<center><br \/>\n<br \/><a href=\"https:\/\/www.thestar.com.my\/news\/nation\/2026\/06\/16\/onn-hafiz-urges-putrajaya-to-expedite-work-on-e-art-system-for-jb\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><br \/>\n<center\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>KULAI: Caretaker Johor Mentri Besar Datuk Onn Hafiz Ghazi has urged Putrajaya to speed up implementation of the Elevated Autonomous Rapid Transit (E-ART) project. He&#8230;<\/p>\n","protected":false},"author":1,"featured_media":61187,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-61186","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/61186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=61186"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/61186\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/61187"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=61186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=61186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=61186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}