{"id":42323,"date":"2026-04-07T05:49:35","date_gmt":"2026-04-06T21:49:35","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=42323"},"modified":"2026-04-07T05:49:35","modified_gmt":"2026-04-06T21:49:35","slug":"spores-first-3d-printed-pedestrian-bridge-set-to-be-completed-in-2028","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=42323","title":{"rendered":"S\u2019pore\u2019s first 3D-printed pedestrian bridge set to be completed in 2028"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013 <!-- -->In <!-- -->2028<!-- -->, the first pedestrian bridge in Singapore to be constructed using 3D printing will go across the Jurong River, connecting <!-- -->residents from <!-- -->Jurong West to the new Tengah town, where more housing developments have been planned.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The use of the new technology is part of the Land Transport Authority\u2019s (LTA) efforts to improve construction productivity amid labour constraints.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Such 3D concrete-printing technology provides manpower savings of <!-- -->up to 50 per cent<!-- --> due to the use of robotic arms, and cuts the time needed to produce a bridge segment from up to <!-- -->one day to four hours<!-- -->.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The bridge, to be located near Block 410 Jurong West Street 42, measures 10m long and 5m wide.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Research and development work for it started in <!-- -->January 2023<!-- -->, costing about $1.4 million for the development of material suitable for 3D printing, the engineering design of the bridge, and production and testing of the scale model, said Mr Allan Yeo, deputy director of street design and infrastructure technology at LTA.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">LTA organised a media visit on April 2 to the DNV Technology Centre (West) laboratory near Joo Koon, where structural load tests were carried out on a smaller model of the bridge \u2013 10m long and<!-- --> 2.5m wide<!-- --> \u2013 using 18 tanks, each filled with one tonne of water, to assess the structure\u2019s behaviour.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The load of this new bridge will be equal to that of a typical pedestrian bridge, said LTA.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9843ad2b6d918c736bc997e9f16b466bc095208e580877a3cf1a7a2be386576c?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9843ad2b6d918c736bc997e9f16b466bc095208e580877a3cf1a7a2be386576c?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9843ad2b6d918c736bc997e9f16b466bc095208e580877a3cf1a7a2be386576c?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9843ad2b6d918c736bc997e9f16b466bc095208e580877a3cf1a7a2be386576c\" alt=\"\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 flex flex-col gap-08 py-16 desktop:pb-24\">\n<p class=\"font-eyebrow-baseline-regular text-secondary\" data-testid=\"inline-media-caption-test-id\">A scale model of the 3D concrete-printed pedestrian bridge used for structural load testing at DNV Technology Centre (West) on April 2.<\/p>\n<p class=\"font-eyebrow-baseline-regular text-placeholder\" data-testid=\"inline-media-credit-test-id\">ST PHOTO: AZMI ATHNI<\/p>\n<\/figcaption><\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Tests on the smaller model were completed as at March 31, and the collected data will be analysed to validate calculations and to check for structural integrity. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Following this, parts of this model may be repurposed by the authority.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">LTA added that it will proceed to construct the full-sized bridge if these results are favourable.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:960 \/ 1244\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9c95499e77b68be7c8dd4459ea8f812f060611b376f3538156bbeae0e658b8e0?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9c95499e77b68be7c8dd4459ea8f812f060611b376f3538156bbeae0e658b8e0?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9c95499e77b68be7c8dd4459ea8f812f060611b376f3538156bbeae0e658b8e0?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/9c95499e77b68be7c8dd4459ea8f812f060611b376f3538156bbeae0e658b8e0\" alt=\"\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Construction of the bridge by 3D concrete printing is done layer by layer.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Robotic arms squeeze a high-strength concrete mix of cement, sand and water through a nozzle of the printer.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">To prevent cracks, uneven surfaces or voids within a printed segment of the bridge, it is essential to ensure a consistent flow of the concrete mix \u2013 by controlling printing speed, pumping from the nozzle, and mixing conditions such as temperature.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:960 \/ 1446\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/8b0d6e1c8c9c5e4150e78c6a2819ca7a85e0b54218aa6ebd3e1a720573aba128?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/8b0d6e1c8c9c5e4150e78c6a2819ca7a85e0b54218aa6ebd3e1a720573aba128?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/8b0d6e1c8c9c5e4150e78c6a2819ca7a85e0b54218aa6ebd3e1a720573aba128?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/8b0d6e1c8c9c5e4150e78c6a2819ca7a85e0b54218aa6ebd3e1a720573aba128\" alt=\"\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The development of the concrete material is crucial to the process \u2013 it needs to be relatively fluid during printing, not harden too quickly, and retain its shape after printing.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Material that hardens too quickly could result in cracks in the segments. Material that is too soft would not be able to retain the intended shape and could collapse easily after a few layers are laid out.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The final bridge will consist of 10 concrete segments, which will be threaded tightly together using steel cables along the entire length of the bridge. <\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:960 \/ 1832\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/28626c66ae92b80aa4c4c269befb33ad6d556101686691770edcba2c5e6de614?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/28626c66ae92b80aa4c4c269befb33ad6d556101686691770edcba2c5e6de614?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/28626c66ae92b80aa4c4c269befb33ad6d556101686691770edcba2c5e6de614?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/28626c66ae92b80aa4c4c269befb33ad6d556101686691770edcba2c5e6de614\" alt=\"\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">This <!-- -->project<!-- --> involved research and testing by LTA in collaboration with the Singapore Centre for 3D Printing at<!-- --> Nanyang Technological University<!-- -->, engineering consultancy Witteveen+Bos and 3D concrete printing construction firm CES_Innovfab.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The projected completion of the bridge across the Jurong River in 2028 will dovetail with the completion of connecting roads and footpaths that connect with Tengah town, said LTA\u2019s Mr Yeo.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">He added that this particular stretch of the Jurong River was identified as structurally suitable and \u201cmanageable\u201d to build the new bridge on, as it is narrower in width and has no complex site constraints.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The new bridge is 10m long, shorter than other pedestrian overhead bridges, which are around 20m to 25m long.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">On future uses for 3D printing technology, Mr Yeo said 3D concrete printing is still an emerging technology for construction.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">He noted that this project serves as a test of the potential feasibility of the technology, and that the authority will continue to explore suitable applications for other projects. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">No other sites for similar pedestrian bridges have been identified, said Mr Yeo.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">On the total cost of the final 3D-printed bridge, he said the authority is unable to provide estimated figures as construction works have not been tendered.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">In Singapore, 3D printing has been used to construct the <a href=\"https:\/\/www.straitstimes.com\/singapore\/spores-first-on-site-3d-printing-of-structural-elements-cuts-down-on-needed-manpower-materials?ref=inline-article\" rel=\"nofollow noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">exterior walls of a childcare centre<\/span><\/a> in Woodlands, and to <a href=\"https:\/\/www.straitstimes.com\/tech\/3d-printed-limbs-tools-co-created-by-spore-non-profit-group-plug-assistive-tech-gaps?ref=inline-article\" rel=\"nofollow noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><span class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">create assistive devices, such as 3D-printed hands,<\/span><\/a> for people with disabilities.<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/spores-first-3d-printed-pedestrian-bridge-set-to-be-completed-in-jurong-west-in-2028\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013 In 2028, the first pedestrian bridge in Singapore to be constructed using 3D printing will go across the Jurong River, connecting residents from&#8230;<\/p>\n","protected":false},"author":1,"featured_media":42324,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-42323","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/42323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42323"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/42323\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/42324"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}