{"id":41681,"date":"2026-04-04T13:23:36","date_gmt":"2026-04-04T05:23:36","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=41681"},"modified":"2026-04-04T13:23:36","modified_gmt":"2026-04-04T05:23:36","slug":"new-train-for-cross-island-line-gets-first-public-reveal-by-jeffrey-siow-singapore-news","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=41681","title":{"rendered":"New train for Cross Island Line gets first public reveal by Jeffrey Siow, Singapore News"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p>With just about four years to go before the first phase of Singapore\u2019s eighth MRT line \u2014 the <a href=\"https:\/\/www.asiaone.com\/singapore\/first-phase-cross-island-mrt-line-finalised-will-have-12-stations\" target=\"_blank\" rel=\"noopener\">Cross Island Line (CRL)<\/a> \u2014 commences service in 2030, Acting Transport Minister Jeffrey Siow has given the public a preview of the CR151 trains to be used on the line.\u00a0<\/p>\n<p>He posted the photos of the trains on his Facebook yesterday (April 2).<\/p>\n<p>Siow, who is also Senior Minister of State for Finance, was in China for the annual Singapore-Shandong Business Council meeting, which he co-chaired with Shandong Governor Zhou Naixiang.<\/p>\n<p>A total of 10 agreements covering areas of mutual interest such as trade and connectivity, green economy, and modern services, were inked between Singapore and Shandong companies during the meeting.<\/p>\n<p>The acting minister also met up with Singaporean businesses based in Jinan to understand their current business priorities.\u00a0<\/p>\n<h2>Visit to Qingdao rail depot<\/h2>\n<p>He also took time to visit Qingdao rail depot on Thursday (April 2), to understand their latest rail technologies.\u00a0<\/p>\n<p>Operated by CRRC, the world&#8217;s largest supplier of rail transit equipment, the depot is also the birthplace of MRT trains used on the North-South, East-West and Thomson-East Coast MRT lines.\u00a0<\/p>\n<p>It is also where 44 six-car trains for the CRL will be built at, after the Land Transport Authority announced in June 2023 that it had awarded a consortium, including CRRC Qingdao SIfang, a $589 million contract for the supply of the 44 trains.<\/p>\n<p>Members of the public were last given a look at the train through a mixed reality mock-up at the Singapore Mobility Gallery in 2024.\u00a0<\/p>\n<p>Similar to the trains for the Thomson-East Coast Line, each car on the new train will have five doors on each side.<\/p>\n<p>They will also have condition monitoring and diagnostic systems for early detection of potential equipment faults.\u00a0<\/p>\n<p>According to LTA, some trains will also be equipped with an automated track inspection system to monitor the condition of the running rail.<\/p>\n<p><iframe loading=\"lazy\" frameborder=\"0\" height=\"748\" width=\"500\" scrolling=\"no\" src=\"https:\/\/www.facebook.com\/plugins\/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fjeffreysiowzx%2Fposts%2Fpfbid0RG9nhzaT8Mgy7p2We3PLCNY9vVmeuYVBXJfCVZN6cmJji9Mv2hii3W8Tv5oKRhMSl&amp;show_text=true&amp;width=500\" allowfullscreen=\"\" allow=\"autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share\">\u00a0<\/iframe><\/p>\n<h2>About the Cross Island Line<\/h2>\n<p>When fully operational, the CRL will be Singapore\u2019s longest <a href=\"https:\/\/www.asiaone.com\/singapore\/cross-island-mrt-line-run-directly-under-central-catchment-nature-reserve\" target=\"_blank\" rel=\"noopener\">fully underground MRT line<\/a> at more than 50km long.<\/p>\n<p>It will serve existing and future developments in the eastern, western, and northeastern corridors, connecting major hubs such as Jurong Lake District, Punggol Digital District and Changi region.\u00a0<\/p>\n<p>[[nid:732264]]<\/p>\n<p><a href=\"https:\/\/www.asiaone.com\/singapore\/mailto:editor@asiaone.com\" target=\"_blank\" rel=\"noopener\">editor@asiaone.com<\/a><\/p>\n<p><em>No part of this story can be reproduced without the permission of AsiaOne.<\/em><\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.asiaone.com\/singapore\/mrt-cross-island-line-cr151-train-jeffrey-siow\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With just about four years to go before the first phase of Singapore\u2019s eighth MRT line \u2014 the Cross Island Line (CRL) \u2014 commences service&#8230;<\/p>\n","protected":false},"author":1,"featured_media":41682,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-41681","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/41681","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=41681"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/41681\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/41682"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=41681"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=41681"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=41681"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}