{"id":30011,"date":"2026-02-20T16:51:37","date_gmt":"2026-02-20T08:51:37","guid":{"rendered":"https:\/\/sgbuzz.com\/?p=30011"},"modified":"2026-02-20T16:51:37","modified_gmt":"2026-02-20T08:51:37","slug":"no-mrt-service-between-tanah-merah-expo-from-march-14-17-due-to-upgrading-works","status":"publish","type":"post","link":"https:\/\/sgbuzz.com\/?p=30011","title":{"rendered":"No MRT service between Tanah Merah, Expo from March 14-17 due to upgrading works"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">SINGAPORE \u2013\u00a0There will be no train service on the East-West Line (EWL) between Tanah Merah and Expo stations from March 14 to 17, so that works to <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/no-ewl-train-services-between-tanah-merah-and-tampines-from-dec-7-to-10-for-track-works-to-be-done?ref=inline-article\" rel=\"nofollow noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><\/p>\n<p class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">disconnect train tracks linking the EWL to Changi Depot<\/p>\n<p><\/a> can take place.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Commuters can take a shuttle bus between Tanah Merah and Expo, which will operate at intervals of about five to eight minutes during the affected period, said the Land Transport Authority (LTA) and rail operator SMRT in a joint statement on Feb 20.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Passengers may also use existing bus services to connect to other MRT lines, such as the Downtown Line, they said. Expo station is also on the Downtown Line. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">LTA added that train service between Expo and Changi Airport will run at seven-minute intervals during peak hours. Train service between Tuas Link and Pasir Ris will continue to operate as normal.  <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">This will be the third and final planned service <!-- -->suspension<!-- --> to link the EWL to the new East Coast Integrated Depot. <\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1080 \/ 1350\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/2866690cac182970388affadbb684bcc662f6e84c794b90766016456635b94e5?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/2866690cac182970388affadbb684bcc662f6e84c794b90766016456635b94e5?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/2866690cac182970388affadbb684bcc662f6e84c794b90766016456635b94e5?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/2866690cac182970388affadbb684bcc662f6e84c794b90766016456635b94e5\" alt=\"\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The first suspension, from Dec 7 to Dec 10, 2024, halted train service between Tanah Merah and Tampines <!-- -->to begin connecting the EWL to the new depot.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The second, from Nov 29 to Dec 8, 2025, <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/mrt-service-from-bedok-to-tampines-tanah-merah-to-expo-to-resume-ahead-of-schedule-on-dec-8?ref=inline-article\" rel=\"nofollow noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><\/p>\n<p class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">suspended service between Bedok and Tampines,<\/p>\n<p><\/a> as well as between Tanah Merah and Expo, to complete the remaining track connections to the depot and connect a new platform at Tanah Merah station.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Construction on the <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/spores-biggest-train-and-bus-depot-on-course-to-open-in-2026-98-of-structural-works-done?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><\/p>\n<p class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">depot began in 2016<\/p>\n<p><\/a>. The facility, which is set to open in the second half of 2026, will house train depots serving the East-West, Thomson-East Coast and Downtown lines, as well as a bus depot.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Meanwhile, train service on the Sengkang-Punggol LRT (SPLRT) will operate on a single loop for seven months, from April 19 to Oct 18.  <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">This means there will be no service on the Sengkang West Inner Loop \u2013 via Cheng Lim station from Sengkang station \u2013 during this period, said LTA and SPLRT operator SBS Transit.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Commuters can use regular bus services or the Sengkang West Outer Loop via Renjong station, which will run entirely with two-car light rail vehicles (LRVs) to boost capacity, said LTA and SBS Transit.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">A shuttle bus will also operate from Sengkang Bus Interchange on weekdays during peak hours \u2013 from 6am to 10am, and from 5.30pm to 9.30pm \u2013 to supplement LRT capacity. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The shuttle will ply different routes in the morning and evening to better match travel patterns, LTA and SBS Transit said. It will run at intervals of about three to five minutes and charge the same fares as LRT journeys.<\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/df746d6e0f96ac2938ae3dcb3f3a52853db24a9aaf3b4b83cca7486228f28c10?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/df746d6e0f96ac2938ae3dcb3f3a52853db24a9aaf3b4b83cca7486228f28c10?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/df746d6e0f96ac2938ae3dcb3f3a52853db24a9aaf3b4b83cca7486228f28c10?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/df746d6e0f96ac2938ae3dcb3f3a52853db24a9aaf3b4b83cca7486228f28c10\" alt=\"\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 flex flex-col gap-08 py-16 desktop:pb-24\">\n<p class=\"font-eyebrow-baseline-regular text-secondary\" data-testid=\"inline-media-caption-test-id\">Works being done at Layar LRT station to connect new tracks ahead of the Sengkang West Inner Loop closure.<\/p>\n<p class=\"font-eyebrow-baseline-regular text-placeholder\" data-testid=\"inline-media-credit-test-id\">ST PHOTO: JASEL POH<\/p>\n<\/figcaption><\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">LTA and SBS Transit said extended engineering hours are needed to carry out major modifications to existing tracks, connect new tracks, and install and test signalling systems and equipment.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Commuters who board the shuttle buses before 7.30am or between 9am and 9.45am will continue to be eligible for the Travel Smart Journeys programme, which rewards those who travel outside peak hours. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The shuttle service will start on April 13, one week before the service adjustment begins. This will give commuters time to familiarise themselves with the service, said LTA and SBS Transit. Crowd marshals will also be on hand to assist commuters.<\/p>\n<figure class=\"portrait inline-media-wrapper\" style=\"--aspect-article-portrait:1080 \/ 1350\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c2ded4f3937051725918b8db2fc7d28493dd0804b15990aa5a1e6edf50ce8fcf?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c2ded4f3937051725918b8db2fc7d28493dd0804b15990aa5a1e6edf50ce8fcf?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c2ded4f3937051725918b8db2fc7d28493dd0804b15990aa5a1e6edf50ce8fcf?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/c2ded4f3937051725918b8db2fc7d28493dd0804b15990aa5a1e6edf50ce8fcf\" alt=\"\" class=\"aspect-portrait flex items-start shrink-0 portrait article-portrait object-contain mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div>\n<\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">To meet growing demand on the SPLRT, <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/sengkang-punggol-lrt-gets-15-8-per-cent-capacity-boost-with-new-trains?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><\/p>\n<p class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">its fleet is being progressively expanded<\/p>\n<p><\/a>. There are currently 25 one-car LRVs and 16 two-car LRVs.  <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Works are ongoing to <a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/LTA-awards-596m-contracts-for-trains-and-depot-expansion-on-Sengkang-Punggol-LRT-system-189446?ref=inline-article\" rel=\"noopener\" class=\"gap-x-04 items-center inline text-primary-60 select-auto\" aria-label=\"link\" target=\"_blank\" data-testid=\"custom-link\"><\/p>\n<p class=\"font-body-baseline-regular inline\" data-testid=\"paragraph-test-id\">expand the SPLRT depot<\/p>\n<p><\/a> to accommodate a larger fleet, which will eventually comprise 33 two-car LRVs. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Since July 2025, new two-car LRVs have been progressively introduced to replace the first-generation fleet. By end-February, seven new two-car LRVs will be in passenger service, said LTA and SBS Transit. <\/p>\n<figure class=\"landscape inline-media-wrapper\" data-testid=\"inline-media-test-id\">\n<div class=\"flex flex-col items-start relative w-fit\"><picture><source media=\"(max-width: 480px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/76f0f66d83b3b729b4ed6bd98c3f0bc3e8c313cfc53adc1ab6a45dd1105d5381?w=480\"\/><source media=\"(min-width: 481px) and (max-width: 720px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/76f0f66d83b3b729b4ed6bd98c3f0bc3e8c313cfc53adc1ab6a45dd1105d5381?w=720\"\/><source media=\"(min-width: 721px)\" srcset=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/76f0f66d83b3b729b4ed6bd98c3f0bc3e8c313cfc53adc1ab6a45dd1105d5381?w=900\"\/><img decoding=\"async\" src=\"https:\/\/cassette.sphdigital.com.sg\/image\/straitstimes\/76f0f66d83b3b729b4ed6bd98c3f0bc3e8c313cfc53adc1ab6a45dd1105d5381\" alt=\"\" class=\"aspect-landscape flex items-start shrink-0 object-cover landscape article-landscape mobile:w-auto tablet:w-auto\" data-testid=\"image-test-id\" loading=\"lazy\"\/><\/picture><\/div><figcaption class=\"mobile:mx-16 tablet:mx-00 flex flex-col gap-08 py-16 desktop:pb-24\">\n<p class=\"font-eyebrow-baseline-regular text-secondary\" data-testid=\"inline-media-caption-test-id\">Extended engineering hours are needed to carry out major modifications to existing tracks, connect new tracks, and install and test signalling systems and equipment.<\/p>\n<p class=\"font-eyebrow-baseline-regular text-placeholder\" data-testid=\"inline-media-credit-test-id\">ST PHOTO: JASEL POH<\/p>\n<\/figcaption><\/figure>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">The remaining <!-- -->18<!-- --> new LRVs will be deployed progressively after depot expansion works are completed in 2027.<\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">To support the larger fleet, the SPLRT depot is being expanded from 3.5ha to 11.1ha. <\/p>\n<p class=\"font-body-baseline-regular text-primary\" data-testid=\"article-paragraph-annotation-test-id\">Sengkang LRT, which opened in 2003, has 14 stations across two loops. It connects residents in the area to the town centre, Sengkang MRT station on the North East Line, and Sengkang Bus Interchange. <\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.straitstimes.com\/singapore\/transport\/no-mrt-service-between-tanah-merah-expo-from-march-14-17-due-to-upgrading-works\" target=\"_blank\" rel=\"noopener\">Read Full Article At Source <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SINGAPORE \u2013\u00a0There will be no train service on the East-West Line (EWL) between Tanah Merah and Expo stations from March 14 to 17, so that&#8230;<\/p>\n","protected":false},"author":1,"featured_media":30012,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[2611],"tags":[],"class_list":["post-30011","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buzz-headlines","wpcat-2611-id"],"_links":{"self":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/30011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=30011"}],"version-history":[{"count":0,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/posts\/30011\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=\/wp\/v2\/media\/30012"}],"wp:attachment":[{"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=30011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=30011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sgbuzz.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=30011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}